Date | Client |
---|---|
April 2022 | EDF Energy |
Scope
EDF Emergent requested out of hours on Bank Holiday Monday 18” Carbon Steel Gen TX 2 Spare Oil Conservator which was suffering from a through-wall defect due to external corrosion of the weld. This repair was subsequently designed for a through-wall defect.
Solution
ICR were onsite the following day, with an engineered repair solution of 8 layers of Technowrap™ 2K LT was delivered to restore the integrity for a design life of 15-years.
Results & Benefits
- Technicians onsite within 24 hours, installation was delivered, QA/QC checked and handed back to site in a 3 day window
- 15 year Design life